New steps and front sidewalk

We have replaced the crumbling steps at the East door of the Randleman House. Handrails are on back order. We replaced the sidewalk leading up to the South door. Both of these projects were badly needed. 

Plans are being made to pave the drive and continue it around the house to exit on Circle Drive. Angled parking will be available along the East side with handicapped space and ramp on the North

Work Continues on the Lustron

The heating and cooling systems are going into the Lustron this week (Sept 1 2022)

Brown tiles  similar to the originals will be laid throughout the home.

The furniture and fixtures will be installed and the home will be available for use.